Monday, June 15, 2009

And at the end of Day One



The demolished area is the size of the new laundry room--not huge, but much bigger than some people's mud rooms. The door will be move over to the right, a small double cabinet set (upper and lower) and the old refrigerator will sit on that wall on the right (visible in the lower picture). The washer and dryer will sit where the door is now. The door into the house will become a pocket door. Next step is probably removing the current door and setting up for the new concrete floor that will bring the height of the new room up to the house level, which can be seen at the bottom of the current inside door. Note the pile of popcorn ceiling crap in the right hand corner--took the poor guy about an hour to scrap all of that off.

No comments:

Post a Comment